Stone Ore crushing Equipment-Rock Jaw crusher

Stone Ore crushing Equipment-Rock Jaw crusher

Mining and Reclamation Plan SOM State of Michigan

2016-2-26  State of Michigan Department of Natural Resources Metallic Minerals Lease No M-00602 J.1.a. Mining an d Reclamation Plan. No mining shall take place on leased premises without a mining and reclamation plan developed by Lessee and approved by Lessor.

get price

Surface Coal Mining and Reclamation State of

Under the provisions of the Federal Surface Mining Control and Reclamation Act of 1977, P.L. 95-87, the U.S. Department of Interior, Office of Surface Mining Reclamation and Enforcement, has implemented a federal program for coal mining in Michigan. Therefore, until the state attains primacy over P.L. 95-87, Michigan's coal mining operations will be dually regulated.

get price

Items requiring attention in Kennecott’s leases involving

2007-9-5  A mining and reclamation plan for the leased premises shall be developed to insure to the maximum extent practicable that: waste areas and lean ore are located, designed and utilized to maximize aesthetic attractiveness and promote reclamation; mining is conducted in a manner which will prevent or mitigate hazardous conditions which result from slumping, heaving and subsidence; and that post mining uses of the premises are as or more valuable than the uses prior to mining. The mining

get price

EGLE Mining State of Michigan

The Department of EGLE, Oil, Gas, and Minerals Division (OGMD) regulates several mining industries in Michigan including, metallic mining, native copper mining, sand dune mining, and coal mining. The OGMD enforces regulations which address issues such as transportation, storage, treatment, and disposal of ore, waste rock, and plans for mining and reclamation.

get price

Mining in Michigan: A focus on nonferrous mineral

2016-2-26  also include a detailed plan for mining and reclamation that will minimize impacts of the proposed operation, with special emphasis on preventing and controlling acid-mine drainage, together with a contingency plan for dealing with any accidents or failures.

get price

Assessment of a Novel Reclamation Effort in Grand

In 2000, the Michigan DNR proposed a novel reclamation plan to restore one of these dunes after being mined. This dune area, the former Manley-Peters Sand Mine (MPSM), is located in Grand Mere State Park in Berrien County, Michi- gan.

get price

RECLAMATION PLAN FOR (name of Mine) MINING

RECLAMATION PLAN FOR _____(name of Mine) MINING OPERATION Note: This prototype, developed by the State Mining and Geology Board (Board), is intended to assist smaller-scale mine operators in environmentally non-sensitive areas to conform to the requirements of the Surface Mining and Reclamation Act (SMARA) and related Board regulations. It serves as an

get price

SAND MINE RESTORATION PLAN US EPA

2015-9-2  Mining and Reclamation Plan (PCUMRP) and an Environmental Impact Statement (EIS) were prepared in 1984. Following final issuance of the permit on June 17, 1985, mining operations began. Manley Brothers operated this mine until it was purchased by TechniSand, Inc.

get price

Mining and Reclamation Plan Instructions

Long Form Mining & Reclamation Plan (no explosivies) Long Form Mining & Reclamation Plan (with the use of explosives) Contact Information. For more information contact: Molly Michaelson at [email protected], MDE Mining Program, MOG, 1800 Washington Boulevard, Baltimore, Maryland 21230, 410-537-3568

get price

SMARA Reclamation Plan Submittal Procedure

SMARA Reclamation Plan Submittal Procedure Under the Surface Mining and Reclamation Act of 1975 (SMARA) Section 2774 (c), local lead agencies are required to submit reclamation plans and plan amendments to the Director of the Department of Conservation (i.e., DMR) for review prior to approving such documents.

get price

Mining Reclamation and Cookies

2005-8-9  State of Michigan Objective: (EG) V.1.5 “All students will analyze effects of technology on the earth’s surface and resources.” Completion of State Objective: In this activity the students will be modeling mining and its effect on a local environment. The students will see how mining out chocolate chips without a plan will destroy the cookie.

get price

SMARA Reclamation Plan Submittal Procedure

SMARA Reclamation Plan Submittal Procedure. Under the Surface Mining and Reclamation Act of 1975 (SMARA) Section 2774 (c), local lead agencies are required to submit reclamation plans and plan amendments to the Director of the Department of Conservation (i.e., DMR) for review prior to approving such documents.

get price

Assessment of a Novel Reclamation Effort in Grand

Furthermore, the 2011 survey of the MPSM reclamation site flora will provide a baseline assessment for use in long-term monitoring of this novel reclamation effort in Grand Mere State Park. A Michigan DNR permit (#RD-SU-2011-010) was granted for field work and the collection of plants at the MPSM reclamation

get price

INTRODUCTION WHAT IS A RECLAMATION BOND?

1997-12-4  the Department of Interior’s Office of Surface Mining and Reclamation (OSMR) handbook on bond amount calculations. Similar to Montana statutory criteria, the federal handbook requires a bond sufficient to cover the cost of reclamation in accordance with the reclamation plan if performed by the regulatory authority in the event of forfeiture.

get price

2014 Annual Mining and Reclamation Report Humboldt

2016-3-8  632 to submit an annual Mining and Reclamation Report as detailed in R 425.501. The MRR is required to provide a description of mining and reclamation activities, updated contingency plan, monitoring results, tonnage of material processed, and a list of incident reports

get price

Reclamation Arizona State Mine Inspector

2 天前  The Reclamation Division's primary responsibility is the approval (or denial) of mined land reclamation plans submitted by all metalliferous & aggregate mining units and exploration operations with surface disturbances greater than five acres on private lands within the State of Arizona.

get price

COMPREHENSIVE RECLAMATION PLAN FOR Alabama

2012-9-26  COMPREHENSIVE RECLAMATION PLAN . FOR. Site/pit name and ADOL File Number (Attach legal description and map.) This plan will be followed to carry out reclamation as mining progresses, as well as the final closeout of the above-referenced site by: _____ (Operator’s Name and Address) _____ ____ I. Reclamation Practices During Mining. 1.

get price

lands under the approved state reclamation plan on non

2014-4-10  state program and the reclamation of abandoned mine . lands under the approved state reclamation plan on non-federal and non-Indian lands. (d) The Secretary of the U.S. Department of the Interior may delegate to a state through a cooperative agreement certain authority relating to the regulation of surface coal mining and reclamation operations on

get price

Planning Department > General Information >

California's "Surface Mining And Reclamation Act" of 1975 Public Resources Code, Division 2, Chapter 9, Section 2710 et seq. The intent of SMARA is to create and maintain an effective and comprehensive surface mining and reclamation policy, with regulation of surface mining operations.

get price

Overview on Reclamation and Rehabilitation of Mines

2017-1-25  Time-bound reclamation to regenerate the better eco-system, concurrent with extraction, international norms to be integral part of mine development strategy NMP, 1993 : Emphasized for orderly and systematic mine closure MCDR, 1988 : Concept of Mining Plan & Provisions for restoration, reclamation and rehabilitation of lands affected by mining

get price

Michigan: Reclamation project will improve, restore

2018-5-11  As a result of a mineral lease signed Tuesday with Spring Mill Reclamation, LLC, the Michigan Department of Natural Resources now can move forward on a long-awaited effort to improve and restore a significant portion of Island Lake State Recreation Area in Livingston County. The reclamation project site involves a 540-acre former gravel mine in the state park south of Spring Mill

get price

Reclamation Bonds OSMRE

Reclamation Bonds. The Surface Mining Control and Reclamation Act of 1977 (SMCRA) provides that, as a prerequisite for obtaining a coal mining permit, an applicant must post a reclamation bond to ensure that the regulatory authority has sufficient funds to reclaim the site in the case the permittee fails to complete the approved reclamation plan.

get price

Mining and Reclamation Plan Instructions

Long Form Mining & Reclamation Plan (no explosivies) Long Form Mining & Reclamation Plan (with the use of explosives) Contact Information. For more information contact: Molly Michaelson at [email protected], MDE Mining Program, MOG, 1800 Washington Boulevard, Baltimore, Maryland 21230, 410-537-3568

get price

Mining operation gets go-ahead Livingston Daily

2015-12-3  This October, the Michigan Department of Natural Resources approved the reclamation plan. The plan is for McCoig Materials Inc. to mine about 6.8 million tons of aggregate material for 10 years.

get price

2014 Annual Mining and Reclamation Report Humboldt

2016-3-8  632 to submit an annual Mining and Reclamation Report as detailed in R 425.501. The MRR is required to provide a description of mining and reclamation activities, updated contingency plan, monitoring results, tonnage of material processed, and a list of incident reports

get price

Nonmetallic mine reclamation plans Wisconsin DNR

2021-7-13  The reclamation plan and any associated map(s) describe and/or delineate all acreage that will be subject to reclamation following the completion of extraction and mining activities. It provides the post-mining land use within the mine plan area and the methods of reclamation necessary to achieve the target post-mining land use.

get price

COMPREHENSIVE RECLAMATION PLAN FOR Alabama

2012-9-26  COMPREHENSIVE RECLAMATION PLAN . FOR. Site/pit name and ADOL File Number (Attach legal description and map.) This plan will be followed to carry out reclamation as mining progresses, as well as the final closeout of the above-referenced site by: _____ (Operator’s Name and Address) _____ ____ I. Reclamation Practices During Mining. 1.

get price

Environmental Regulations for Aggregate Mining

2004-12-18  requiring a mining and reclamation plan along with the permit. For more information on the local permits required for aggregate mining, contact the local county zoning or planning office. Environmental Regulations for Aggregate Mining Prepared by the Minnesota Department of Natural Resources Division of Lands and Minerals 500 Lafayette Road

get price

Mined Land Reclamation Department of Lands

2021-6-3  The Idaho Mined Land Reclamation Act, passed in 1971, requires reclamation of affected lands to return them to a productive condition. Read more about the Mined Land Reclamation Act and see the Mined Land Reclamation Act FAQs. Read more about IDL procedures on the Agency Guidance Documents page.

get price

Overview on Reclamation and Rehabilitation of Mines

2017-1-25  Time-bound reclamation to regenerate the better eco-system, concurrent with extraction, international norms to be integral part of mine development strategy NMP, 1993 : Emphasized for orderly and systematic mine closure MCDR, 1988 : Concept of Mining Plan & Provisions for restoration, reclamation and rehabilitation of lands affected by mining

get price